Heat Cable Inspections - Wasatch Heat Cable: Commercial Grade Heat Tape & Ice Dam Prevention Cables

Heat Cable Inspections

Regardless of the type of heat cable or heat tape you have installed, it should be inspected twice every season. 

Why Roofline Heat Cable Inspection are Crucial

Prevent Costly Damage:
Roofline heat cable helps melt snow and ice, preventing ice dams and costly damage to shingles, gutters, and downspouts. Regular inspections ensure the system works properly when you need it the most—during the harsh winter months.

Boost Roof Safety and Longevity:
By clearing ice and snow, heat cables extend the lifespan of your roof. When they fail, ice can accumulate and cause leaks, rotting, or structural damage. Regular inspections catch small issues before they turn into big (and expensive) problems.

Maintain Energy Efficiency:
A faulty heat tape system not only risks your roof’s integrity but also wastes energy. By ensuring proper operation, you’ll keep your utility bills in check and reduce unnecessary energy consumption.

When to Perform Roofline Heat Cable Inspections

Before Winter Sets In

  • Ideal Time: Early fall or late summer.
  • Why: To ensure cables are ready to combat the first snowfall. If you spot any issues, you’ll have enough time to fix them before temperatures drop.

After Winter Ends

  • Ideal Time: Early spring.
  • Why: To assess any damage caused by harsh winter conditions, such as heavy snow, ice buildup, or fluctuating temperatures. This helps you plan for repairs or replacements well before the next cold season.

Pro Tip: Scheduling these two inspections—one before the snow arrives and one after it melts—keeps your heat tape system in top shape year-round.

Our Address

709 N 400 W
Suite 2
North Salt Lake, UT 84054

Copyright

© 2024 Wasatch Heat Cable. All rights reserved.

In partnership with HeatCable.com